Transmission#

Transmission Networks#

PyPSA-USA offers a unique capability by integrating two options of transmission networks: the ReEDS NARIS-derived zonal network and the Breakthrough Energy - Texas A&M University (TAMU) synthetic nodal network.

ReEDS NARIS-based Networks#

We integrate networks at three spatial scales (County, Balance Area, and FERC 1000) derived from the North American Renewable Integration Study (NARIS) network. These zonal networks are derived from the non-public NARIS nodal network for the US electricity system, by the authors in Brown et. al. and Sergi et. al.. These networks are calculated to be N-1 contingency compliant zonal transfer capacity limits. We describe how these networks can be meshed together to create custom network topologies on the Spatial Configuration page.

  • County ITLs: For higher resolution models that focus on limited spatial scopes, we integrate the county level ITLs which contain 3,108 zones across the United States.

  • ReEDS Balancing Authorities: The ReEDS balancing authority (BA) network has 134 zones across the United States boundaries (133 of which appear in the shipped BA interface table) and can be mapped to balancing authorities, NERC regions, and RTOs/ISOs. Smaller Balancing authorities are not individually represented in this network. For example, BANC is combined into the CAISO north region.

  • FERC 1000 Planning Regions: The FERC 1000 network splits up FERC 1000 transmission planning regions in to 17 sub-regions and nodes for the United States. These 17 regions are supersets of the ReEDS Balancing Authorities, and respect state borders to enable enforcement of regional policy constraints.

ReEDS_topology

FERC1000_topology

TAMU Synthetic Nodal Network#

The TAMU synthetic nodal network offers a high-resolution representation of the US power system, specifically designed for operational simulations. See the Xu. et al. paper for a detailed description of the network. This network includes:

  • High Spatial Resolution: Comprising 82,549 buses, 41,561 substations, 83,497 AC lines, and 17 HVDC lines, it provides a detailed view of a synthetic transmission network.

  • DC Power Flow: Provides data for DC-power flow approximation.

  • Clustering: Due to its high resolution, the TAMU network is not suitable for capacity expansion planning without clustering. As part of the PyPSA-USA workflow the network is clustered with the kmeans and modularity algorithms supported by cluster_network; the kmeans approach follows the network-clustering methods developed by M. Frysztracki et. al. and integrated into the PyPSA package.

While representative of the US electricity system, the TAMU network is synthetic and not precisely aligned with the actual US transmission network. As such we integrated the ReEDS NARIS dataset for planning applications where more precise inter-regional transfer capacity ratings are necessary.

TAMU_clustered

Note

See the Spatial Configuration page for information on how to choose between networks.

Interface Transmission Limits#

The path-by-path ratings above are complemented by interface limits: aggregate MW caps on the total simultaneous flow across a bundle of paths. PyPSA-USA ships the CPUC RESOLVE interface table at workflow/repo_data/config/policy_constraints/transmission_interface_limits.csv, which rates the CAISO import/export capability against the rest of WECC. Override it with electricity: transmission_interface_limits:

Interface

region_1 (inside)

region_2 (outside)

flow_12 (MW)

flow_21 (MW)

CA_NW

p9, p10, p11

p2, p5, p6, p7, p8

3,592

9,269

CA_SW

p9, p10, p11

p12, p13, p25, p27, p28, p30

10,901

10,463

CAISO_Imports

p9, p10, p11

all of the above

9,728

10,208

Flow orientation: flow_12 is the cap on flow out of region_1 (exports), flow_21 the cap on flow into region_1 (imports). Enable the table with model_topology: interface_transmission_limits: true; the constraint formulation is described in Model Constraints.

Warning

The interface caps are applied to the virtual imports / exports links created by add_extra_components, so they bind only when electricity: imports / electricity: exports are enabled, and they only see flow that crosses the boundary of the modeled footprint.

p8 (northeastern California) appears in the region_2 list of every RESOLVE row but is itself a California zone. In a California-only model it is therefore inside the network, and the internal p8-p9 AC corridor — about 300 MW in the ReEDS/NARIS balancing-area table — carries no trade links and escapes the CAISO_Imports cap. Simultaneous CAISO imports are understated by roughly that amount. This gap is documented rather than corrected: closing it would require constraining internal AC lines alongside the trade links.

Data#

Characteristic

Data Source

Spatial Scale

Transmission Topology

Breakthrough Energy / TAMU

CONUS / Interconnections

Transmission Topology

ReEDS (NARIS)

CONUS

Clustering Shapes

ReEDS

CONUS

Balancing Areas (Mixed)

States

Transmission Expansion Costs

NREL ReEDS

CONUS