Transmission#
Transmission Networks#
PyPSA-USA offers a unique capability by integrating two options of transmission networks: the ReEDS NARIS-derived zonal network and the Breakthrough Energy - Texas A&M University (TAMU) synthetic nodal network.
ReEDS NARIS-based Networks#
We integrate networks at three spatial scales (County, Balance Area, and FERC 1000) derived from the North American Renewable Integration Study (NARIS) network. These zonal networks are derived from the non-public NARIS nodal network for the US electricity system, by the authors in Brown et. al. and Sergi et. al.. These networks are calculated to be N-1 contingency compliant zonal transfer capacity limits. We describe how these networks can be meshed together to create custom network topologies on the Spatial Configuration page.
County ITLs: For higher resolution models that focus on limited spatial scopes, we integrate the county level ITLs which contain 3,108 zones across the United States.
ReEDS Balancing Authorities: The ReEDS balancing authority (BA) network has 134 zones across the United States boundaries (133 of which appear in the shipped BA interface table) and can be mapped to balancing authorities, NERC regions, and RTOs/ISOs. Smaller Balancing authorities are not individually represented in this network. For example, BANC is combined into the CAISO north region.
FERC 1000 Planning Regions: The FERC 1000 network splits up FERC 1000 transmission planning regions in to 17 sub-regions and nodes for the United States. These 17 regions are supersets of the ReEDS Balancing Authorities, and respect state borders to enable enforcement of regional policy constraints.


TAMU Synthetic Nodal Network#
The TAMU synthetic nodal network offers a high-resolution representation of the US power system, specifically designed for operational simulations. See the Xu. et al. paper for a detailed description of the network. This network includes:
High Spatial Resolution: Comprising 82,549 buses, 41,561 substations, 83,497 AC lines, and 17 HVDC lines, it provides a detailed view of a synthetic transmission network.
DC Power Flow: Provides data for DC-power flow approximation.
Clustering: Due to its high resolution, the TAMU network is not suitable for capacity expansion planning without clustering. As part of the PyPSA-USA workflow the network is clustered with the
kmeansandmodularityalgorithms supported bycluster_network; the kmeans approach follows the network-clustering methods developed by M. Frysztracki et. al. and integrated into the PyPSA package.
While representative of the US electricity system, the TAMU network is synthetic and not precisely aligned with the actual US transmission network. As such we integrated the ReEDS NARIS dataset for planning applications where more precise inter-regional transfer capacity ratings are necessary.

Note
See the Spatial Configuration page for information on how to choose between networks.
Interface Transmission Limits#
The path-by-path ratings above are complemented by interface limits: aggregate MW caps on
the total simultaneous flow across a bundle of paths. PyPSA-USA ships the CPUC RESOLVE
interface table at workflow/repo_data/config/policy_constraints/transmission_interface_limits.csv,
which rates the CAISO import/export capability against the rest of WECC. Override it with
electricity: transmission_interface_limits:
Interface |
|
|
|
|
|---|---|---|---|---|
|
p9, p10, p11 |
p2, p5, p6, p7, p8 |
3,592 |
9,269 |
|
p9, p10, p11 |
p12, p13, p25, p27, p28, p30 |
10,901 |
10,463 |
|
p9, p10, p11 |
all of the above |
9,728 |
10,208 |
Flow orientation: flow_12 is the cap on flow out of region_1 (exports), flow_21 the
cap on flow into region_1 (imports). Enable the table with
model_topology: interface_transmission_limits: true; the constraint formulation is described
in Model Constraints.
Warning
The interface caps are applied to the virtual imports / exports links created by
add_extra_components, so they bind only when electricity: imports / electricity: exports
are enabled, and they only see flow that crosses the boundary of the modeled footprint.
p8 (northeastern California) appears in the region_2 list of every RESOLVE row but is
itself a California zone. In a California-only model it is therefore inside the network, and
the internal p8-p9 AC corridor — about 300 MW in the ReEDS/NARIS balancing-area table —
carries no trade links and escapes the CAISO_Imports cap. Simultaneous CAISO imports are
understated by roughly that amount. This gap is documented rather than corrected: closing it
would require constraining internal AC lines alongside the trade links.
Data#
Characteristic |
Data Source |
Spatial Scale |
|---|---|---|
Transmission Topology |
Breakthrough Energy / TAMU |
CONUS / Interconnections |
Transmission Topology |
ReEDS (NARIS) |
CONUS |
Clustering Shapes |
ReEDS |
CONUS |
Balancing Areas (Mixed) |
||
States |
||
Transmission Expansion Costs |
NREL ReEDS |
CONUS |